PRECAUTIONS
This products contains stone wool. Use goggles, gloves, mask and long sleeves for protection
TOOLS
• 100% polyurethane construction glue (3 tubes per 100 ft2 or 10 m2)
• Caulking gun
• Electric mitre saw
• Table saw
• Level
• Measuring Tape
• Cutter
• Step Ladder
• Pneumatic finish nailer (#23 gauge finish mail ) PANEL NEEDS TO BE GLUED AND NAILED FOR A SUCCESSFUL INSTALLATION AND TO PREVENT FUTURE WARPING. FAILURE TO COMPLY WITH INSTALLATION INSTRUCTIONS SHALL VOID APPLICATION OF
MAKE SURE YOUR KNIVES AND SAWBLADES ARE IN TOP CONDITION.
FIRST, check that the wall is level from the floor to ceiling and edge-to-edge. If not, adjust accordingly.
STEP 1: If you are using moldings, mark required space around the perimeter of installation area.
STEP 2: On the back of the wall panel, apply a line of 100% polyurethane glue on the edges and between the rectangles on the MDF frame and X’s in the 3 rectangles.
FOR CEILING INSTALLATION:
Apply a fast bonding polyurethane glue on all the surface using a notched trowel and use more nails and a T-brace to hold the panels in place till the glue sets.
STEP 3:
Position the first panel vertically at bottom right. Make sure each panel and each column is level.
STEP 4: Nail panel in place with #23 gauge finish nails in the MDF frames on the edges.
* Nailing in the membrane will damage the wall panel. Be careful to nail in the MDF frame only.
STEP 5: Installation of panels
• Repeat Step 2.
• Set panel B against A.
• Repeat Step 4.
STEP 6:
End a column. Cut any excess of wall panel flush ith the top of wall.
STEP 7: Start a new column. Use remaining piece of previous column. Repeat Step 2 and 4.
STEP 8:Last column. Cut panel on the lest to fit available space.
* Handle with care when making cuts to the wall panel so as not to damage the membrane on the surface.
NOTE: if wood pieces separate from a wall panel, reposition using 100% polyurethane glue.
PRIOR TO INSTALLATION, PLACE CARTONS IN ORIGINAL PACKAGING FLAT ON THE FLOOR OF PLANNED ROOM.
INSTALLATION INSTRUCTIONS